The transformer was successfully transported to site in 2024 - 06 - 11 using a special heavy duty trailer and installed safely as planned with no major issues.
All electrical connections, including high pressure casings and low pressure cable terminals, are carried out by the installation team.
Extensive testing was carried out to verify the integrity of the transformer, including no-load testing, winding resistance measurements and oil quality analysis.
To ensure safe operation, the necessary grounding and mine protection systems were installed.